GOMESA Applications
Project Title | Funding Requested | Awarded Amount | Other Funding Identified | Total Project Funds | Estimated Completion Date | Submission Date | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Details | 2025045 | Artificial Reef Construction MS Sound | Mississippi Department of Marine Resources (MDMR) | $1,000,000 | $1,000,000 | $250,000 | $1,250,000 | 06/30/2027 | 07/05/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025029 | Mississippi Oyster Restoration & Enhancement Project | Mississippi Department of Marine Resources (MDMR) | $1,000,000 | $1,000,000 | $0 | $1,000,000 | 06/30/2025 | 12/06/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025053 | Mississippi Reef Fish Monitoring | Mississippi Department of Marine Resources (MDMR) | $250,000 | $250,000 | $0 | $250,000 | 12/01/2024 | 08/03/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025019 | Spat on Cultch Oyster Reef Restoration Project | Mississippi Department of Marine Resources (MDMR) | $2,000,000 | $2,000,000 | $0 | $2,000,000 | 06/30/2025 | 12/06/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025002 | City of D'Iberville Marina Expansion (Phase II of Working Waterfront) | City of D'Iberville | $2,500,000 | $2,500,000 | $8,436,000 | $25,000,000 | 12/31/2025 | 07/19/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025009 | Diamondhead Sewer Improvements Phase 3 | Diamondhead Water & Sewer District | $849,828 | $1,000,000 | $0 | $1,699,655 | 02/01/2026 | 07/27/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025004 | Martin Bluff and Hickory Hills Sewer Improvements | City of Gautier | $2,701,150 | $2,701,150 | $0 | $2,701,150 | 08/01/2025 | 07/28/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025010 | Asbestos Water Pipe Replacement and Port Bienville Water Improvements | Hancock County Water and Sewer District | $3,504,000 | $1,000,000 | $0 | $3,504,000 | 06/01/2025 | 07/13/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025007 | Poticaw Road Sewer Extension | Jackson County Utility Authority | $1,200,000 | $1,200,000 | $250,000 | $1,450,000 | 08/01/2026 | 01/20/2024 | 2025 | Awarded | Accepted | Yes |
| Details | 2025011 | Expansion of Sewer Services Improvements | Kiln Utility and Fire District | $4,781,400 | $2,452,575 | $0 | $4,781,400 | 12/01/2024 | 08/28/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025017 | Long Beach Smallcraft Harbor – Eastern Bulkhead | City of Long Beach | $2,500,000 | $2,500,000 | $0 | $2,760,000 | 07/01/2026 | 07/31/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 261278 | Artificial Reef Construction MS Sound | Mississippi Department of Marine Resources (MDMR) | $1,000,000 | $0 | $250,000 | $1,250,000 | 06/30/2028 | 05/31/2024 | 2026 | Submitted | ||
| Details | 261279 | City of Pass Christian Gravity Sewer Improvements | City of Pass Christian | $2,854,683 | $0 | $0 | $2,854,683 | 11/01/2025 | 06/18/2024 | 2026 | Submitted | ||
| Details | 261305 | Signet Bulkhead Repair and Renovation Project | Jackson County Board of Supervisors | $4,000,000 | $0 | $4,000,000 | $12,215,810 | 09/01/2024 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261322 | Increasing Oyster Seed Production Through Workforce Development | The University of Southern Mississippi | $1,614,616 | $0 | $0 | $1,614,616 | 06/30/2028 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261323 | Development of a stock enhancement program for the Southern Flounder, Paralichthys lethostigma | The University of Southern Mississippi | $982,521 | $0 | $0 | $982,521 | 06/30/2028 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261284 | Bay St. Louis Citywide Sewer Rehabilitation Project | City of Bay Saint Louis | $4,000,000 | $0 | $8,500,000 | $12,500,000 | 11/30/2025 | 06/19/2024 | 2026 | Submitted | ||
| Details | 261280 | Highway 90 Hurricane Mitigation Improvements - Phase III | City of Pass Christian | $2,558,766 | $0 | $0 | $2,558,766 | 06/01/2026 | 06/18/2024 | 2026 | Submitted | ||
| Details | 261306 | Graveline Bayou Inlet Restoration Study | Jackson County Board of Supervisors | $750,000 | $0 | $100,000 | $850,000 | 03/01/2026 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261285 | Harbor Repairs and Improvements | City of Bay Saint Louis | $1,200,000 | $0 | $0 | $1,200,000 | 01/31/2026 | 06/19/2024 | 2026 | Submitted | ||
| Details | 261281 | West Harbor Bulkhead Wall Replacement - Phase IV | City of Pass Christian | $2,758,055 | $0 | $0 | $2,758,055 | 07/01/2026 | 06/18/2024 | 2026 | Submitted | ||
| Details | 261307 | Unmanned Hydrographic Field Methods for Benthic Mapping and Monitoring | National Oceans Applications Research Center (NOARC) | $2,099,357 | $0 | $0 | $2,099,357 | 06/01/2030 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261286 | Hwy 603 from Hwy 43 to Cuevas Town Road Sewer Extension | Kiln Utility and Fire District | $2,600,000 | $0 | $2,452,575 | $5,052,575 | 01/31/2026 | 06/19/2024 | 2026 | Submitted | ||
| Details | 261287 | Drainage Improvements to Live Oak Corridor Phase 2 | City of Pascagoula | $4,832,250 | $0 | $2,000,000 | $6,832,250 | 12/30/2027 | 06/20/2024 | 2026 | Submitted | ||
| Details | 261288 | City of D'Iberville Working Waterfront & Seafood Harbor | City of D'Iberville | $2,000,000 | $0 | $14,000,000 | $25,000,000 | 06/30/2027 | 06/18/2024 | 2026 | Submitted | ||
| Details | 261289 | City of D'Iberville's Watershed Protection Plan | City of D'Iberville | $350,000 | $0 | $0 | $350,000 | 10/31/2027 | 06/18/2024 | 2026 | Submitted | ||
| Details | 261291 | Asbestos Water Pipe Replacement | Hancock County Water and Sewer District | $1,800,000 | $0 | $1,000,000 | $2,800,000 | 01/31/2026 | 06/21/2024 | 2026 | Submitted | ||
| Details | 261292 | Port Bienville Sewer Improvement | Hancock County Water and Sewer District | $2,600,000 | $0 | $0 | $2,600,000 | 01/31/2024 | 06/21/2024 | 2026 | Submitted | ||
| Details | 261310 | 700LF Bulkhead at McLeod Park - Phase 2 | Hancock County Board of Supervisors | $2,156,000 | $0 | $0 | $2,156,000 | 06/01/2026 | 07/10/2024 | 2026 | Submitted | ||
| Details | 261311 | Sewer Lift Station Improvements | City of Gulfport | $1,300,000 | $0 | $0 | $1,300,000 | 03/01/2027 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261295 | Stablewood Sewer Improvements | West Harrison Water & Sewer District | $1,500,000 | $0 | $0 | $1,500,000 | 03/01/2027 | 06/27/2024 | 2026 | Submitted | ||
| Details | 261282 | Sanitary Sewer Pump Station Repairs | City of Pass Christian | $2,929,260 | $0 | $0 | $2,929,260 | 03/01/2026 | 06/19/2024 | 2026 | Submitted | ||
| Details | 261301 | Coastal Mississippi Oyster Enhancement Program | Biloxi Oyster Company, LLC | $8,430,000 | $0 | $0 | $8,430,000 | 12/31/2028 | 06/30/2024 | 2026 | Submitted | In Review | |
| Details | 261304 | Trautman Basin / Outfall Improvements | City of Long Beach | $2,500,000 | $0 | $0 | $2,500,000 | 12/31/2027 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261283 | 2025 Fleitas Avenue Lift Station Replacement | City of Pass Christian | $2,036,671 | $0 | $0 | $2,036,671 | 03/01/2026 | 06/19/2024 | 2026 | Submitted | ||
| Details | 261312 | Coffee Creek “Go Green” Park and Educational/Recreational Facility | City of Gulfport | $6,000,000 | $0 | $0 | $6,000,000 | 10/01/2026 | 07/01/2024 | 2026 | Not Awarded | Submitted | No |
| Details | 261308 | Spat on Cultch Oyster Reef Restoration Project | Mississippi Department of Marine Resources (MDMR) | $2,000,000 | $0 | $0 | $2,000,000 | 06/30/2026 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261313 | Highway 90 Knee Wall Hurricane Mitigation Improvements | City of Gulfport | $1,500,000 | $0 | $0 | $1,500,000 | 12/01/2026 | 07/01/2024 | 2026 | Not Awarded | Accepted | Yes |
| Details | 261314 | Highway 90 Sidewalk Widening West of 20th Avenue | City of Gulfport | $500,000 | $0 | $0 | $500,000 | 03/01/2027 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261309 | Mississippi Oyster Restoration & Enhancement Project | Mississippi Department of Marine Resources (MDMR) | $1,000,000 | $0 | $0 | $1,000,000 | 06/30/2024 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261290 | Forest Cove Sewer Improvements | City of D'Iberville | $3,280,037 | $0 | $0 | $3,280,037 | 01/01/2027 | 06/18/2024 | 2026 | Submitted | ||
| Details | 261293 | Citywide Drainage Improvements | City of Waveland | $9,000,000 | $0 | $0 | $9,000,000 | 01/01/2027 | 06/21/2024 | 2026 | Submitted | ||
| Details | 261315 | Courthouse Road Boat Launch and Jetties Improvements Mitigation Project | City of Gulfport | $1,200,000 | $0 | $1,400,000 | $2,600,000 | 09/01/2026 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261316 | Brickyard Bayou Dredging (East of Courthouse Road) Project | City of Gulfport | $5,000,000 | $0 | $0 | $5,000,000 | 03/01/2028 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261317 | James Hill Park and Hansboro Park Boat Launch and Parking Area Improvements Project | City of Gulfport | $750,000 | $0 | $0 | $750,000 | 06/01/2026 | 07/01/2024 | 2026 | Not Awarded | Accepted | No |
| Details | 251296 | Mitigation of Hurricane Impacts on Mississippi Gulf Coast Municipal Harbors | National Oceans Applications Research Center (NOARC) | $2,370,376 | $2,370,376 | $0 | $2,370,376 | 07/01/2030 | 06/27/2024 | 2025 | Awarded | Accepted | Yes |
| Details | 251318 | Gulfport Wastewater Treatment Plan Upgrades - New Trickling Filter System & Sand/Sludge Removal | City of Gulfport | $1,725,000 | $1,725,000 | $0 | $1,725,000 | 10/01/2026 | 07/01/2024 | 2025 | Awarded | Accepted | Yes |
| Details | 261297 | USM Research and Teaching Vessel | The University of Southern Mississippi | $15,000,000 | $0 | $2,500,000 | $17,500,000 | 06/30/2029 | 06/28/2024 | 2026 | Accepted | Yes | |
| Details | 261298 | Mississippi Coastal Fishery Resource Assessment Program | The University of Southern Mississippi | $747,197 | $0 | $0 | $747,197 | 08/31/2026 | 06/28/2024 | 2026 | Submitted | ||
| Details | 261299 | Diamondhead Drainage, Flood Prevention & Water Quality Improvement Project Phase III | City of Diamondhead | $2,000,000 | $0 | $0 | $2,000,000 | 12/01/2027 | 06/29/2024 | 2026 | Submitted | ||
| Details | 261300 | Oyster Restoration in the Mississippi Sound and Surrounding Estuaries Using Innovative Techniques | Magnolia Key Oyster Co. in partnership with USM | $1,560,500 | $0 | $0 | $1,560,500 | 10/01/2028 | 06/29/2024 | 2026 | Submitted | In Review | |
| Details | 261302 | Singing River Mall Property Stormwater | CIty of Gautier | $2,941,675 | $0 | $0 | $2,941,675 | 06/01/2026 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261303 | Long Beach Smallcraft Harbor - Southern Quay Bulkhead | City of Long Beach | $3,395,700 | $0 | $2,554,000 | $5,949,700 | 07/01/2027 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261319 | Coastal River Protection | City of Moss Point | $3,300,000 | $0 | $0 | $3,300,000 | 12/31/2027 | 07/01/2024 | 2026 | Submitted | ||
| Details | 251321 | Marine Aquaculture Demonstration Center for Economic Development | The University of Southern Mississippi | $3,163,823 | $3,163,823 | $0 | $3,163,823 | 06/30/2028 | 07/01/2024 | 2025 | Awarded | Accepted | Yes |
| Details | 261320 | Coastal Preserves Educational Walkway | Land Trust for the Mississippi Coastal Plain | $3,795,537 | $0 | $71,850 | $3,867,387 | 06/30/2028 | 07/01/2024 | 2026 | Submitted | ||
| Details | 2025001 | Center City Infrastructure Improvements | City of Waveland | $4,000,000 | $4,000,000 | $0 | $4,000,000 | 05/30/2026 | 04/26/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025003 | Washington Avenue at Front Beach - Utility Improvements | City of Ocean Springs | $1,200,000 | $1,200,000 | $362,250 | $1,562,500 | 12/01/2026 | 07/25/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025005 | Coastal River Protection | City of Moss Point | $3,750,000 | $3,750,000 | $285,000 | $4,035,000 | 12/31/2026 | 12/31/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025006 | St. Joseph Stormwater Park | City of Moss Point | $118,500 | $118,500 | $0 | $118,500 | 08/04/2024 | 08/04/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025008 | Fixed Laboratory Equipment for Phase I of the Northern Gulf Aquatic Food Research Center | Mississippi State University | $865,000 | $865,000 | $7,000,000 | $7,865,000 | 10/01/2024 | 05/10/2022 | 2025 | Awarded | Accepted | Yes |
| Details | 2025012 | Utilizing Brood Stock Reefs to Enhance Production on Commercial Oyster Leases | The Nature Conservancy | $1,909,910 | $1,000,000 | $0 | $1,909,910 | 12/31/2028 | 07/28/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025013 | Front Beach Bulkhead and Living Shoreline | City of Ocean Springs | $4,500,000 | $1,600,000 | $7,678,250 | $12,178,250 | 12/01/2026 | 07/25/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025030 | City of Pass Christian Highway 90 Hurricane Mitigation Improvements - Phase II | City of Pass Christian | $2,810,000 | $2,810,000 | $0 | $2,810,000 | 03/01/2024 | 06/23/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2025048 | City of Pass Christian Sanitary Sewer Pump Station Repairs | City of Pass Christian | $2,270,000 | $2,270,000 | $0 | $2,270,000 | 05/01/2025 | 06/23/2023 | 2025 | Awarded | Accepted | Yes |
| Details | 2024001 | Drainage Improvements to Live Oak Corridor | City of Pascagoula | $6,832,250 | $2,000,000 | $0 | $6,832,250 | 12/01/2024 | 05/09/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024002 | North Gulfport Wastewater Treatment Plant Ultraviolet (UV) Disinfection Replacement | City of Gulfport | $1,200,000 | $1,200,000 | $0 | $1,200,000 | 09/01/2022 | 03/13/2023 | 2024 | Awarded | Accepted | Yes |
| Details | 2024003 | Stennis Space Center Wastewater Conveyance Project | Hancock County Utility Authority | $10,650,000 | $10,650,000 | $0 | $10,650,000 | 07/01/2025 | 06/28/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024004 | Long Beach Smallcraft Harbor - Eastern Bulkhead | City of Long Beach | $2,693,000 | $2,693,000 | $0 | $2,693,000 | 12/01/2024 | 07/01/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024005 | City of Pass Christian West Breakwater Wall-Phase II | City of Pass Christian | $2,590,000 | $2,590,000 | $0 | $2,590,000 | 03/01/2024 | 06/29/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024009 | Sewer to Site 1 at Port Bienville Industrial Park (Bank Mitigation) | Hancock County Port & Harbor Commission | $1,749,220 | $1,749,220 | $0 | $1,749,220 | 06/01/2025 | 12/05/2023 | 2024 | Awarded | Accepted | Yes |
| Details | 2024010 | Oak Island Oyster Company: Demonstrating resilient high density oyster aquaculture | The University of Southern Mississippi | $1,195,571 | $1,195,571 | $0 | $1,195,571 | 06/30/2026 | 07/01/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024011 | Coastal Roadway Hurricane Protection | Jackson County Board of Supervisors | $750,000 | $750,000 | $143,000 | $893,000 | 07/01/2024 | 06/29/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024013 | Jourdan River Shores Sewer Improvements Phase 2 | Kiln Utility and Fire District | $2,255,600 | $2,255,600 | $0 | $2,255,600 | 01/01/2023 | 06/16/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024014 | Harrison County Beach Outfall Improvements | Harrison County Board of Supervisors | $2,160,000 | $160,000 | $0 | $2,160,000 | 01/01/2024 | 06/16/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024015 | Ocean Springs Sewer Rehabilitation | City of Ocean Springs | $1,960,000 | $1,960,000 | $0 | $1,960,000 | 12/01/2025 | 07/18/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024017 | City of Pass Christian Highway 90 Hurricane Mitigation Improvements | City of Pass Christian | $2,540,000 | $2,540,000 | $0 | $2,540,000 | 03/01/2024 | 07/29/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024018 | Coastal Mississippi Seafood Marketing & Advertising Campaign | Mississippi Gulf Coast Regional Convention & Visitors Bureau dba Coastal Mississippi | $1,000,000 | $500,000 | $500,000 | $1,500,000 | 06/30/2025 | 05/22/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024019 | Diamondhead Drainage, Flood Prevention & Water Quality Improvement Phase II | City of Diamondhead | $1,999,839 | $1,999,839 | $0 | $1,999,839 | 06/01/2025 | 07/01/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024020 | East Beach Outfalls and Shoreline Protection | Jackson County Board of Supervisors | $1,710,000 | $1,710,000 | $260,000 | $1,970,000 | 07/01/2024 | 06/29/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024022 | Keegans Bayou Restoration | City of Biloxi, supported by Keesler Air Force Base | $2,520,000 | $2,520,000 | $69,978 | $2,589,978 | 07/31/2025 | 07/01/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024024 | Long Beach Smallcraft Harbor - Southern Quay Bulkhead | City of Long Beach | $2,554,000 | $2,554,000 | $0 | $2,554,000 | 05/01/2025 | 07/01/2022 | 2024 | Awarded | Accepted | Yes |
| Details | 2024026 | City of D'Iberville Working Waterfront & Seafood Harbor | City of D'Iberville | $500,000 | $500,000 | $7,936,000 | $7,936,000 | 12/01/2025 | 05/03/2023 | 2024 | Awarded | Accepted | Yes |
| Details | 261275 | Diamondhead Sewer Improvements Phase IV | Diamondhead Water & Sewer District | $2,992,872 | $0 | $0 | $2,992,872 | 07/01/2026 | 07/01/2024 | 2026 | Submitted | ||
| Details | 261274 | Evaluation and Monitoring of Marine Mammal Health in the Mississippi Sound | Mississippi State University | $1,533,963 | $0 | $0 | $1,533,963 | 12/31/2026 | 06/28/2024 | 2026 | Submitted | ||
| Details | 261273 | Artificial Reef Construction and Dive Monitoring | Mississippi Gulf Fishing Banks, Inc (MGFB) | $150,000 | $0 | $100,000 | $250,000 | 07/01/2027 | 06/06/2024 | 2026 | Submitted | ||
| Details | 251272 | MS Coastal Map Revision Project | Southern Mississippi Planning and Development District | $800,000 | $800,000 | $3,507,102 | $4,307,089 | 08/01/2027 | 09/05/2024 | 2025 | Awarded | Accepted | Yes |
| Details | 251199 | Project 4.11, Stennis Airport South of Runway | Hancock County Board of Supervisors | $356,480 | $0 | $0 | $365,480 | 02/01/2026 | 07/14/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251198 | Project 4.13, Harbor Drive | Hancock County Board of Supervisors | $253,716 | $0 | $0 | $253,716 | 08/01/2026 | 07/14/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251197 | Revitalization of Gulfport Least Tern Important Bird Area, Eco-tourism, and Coastal Outreach | National Audubon Society | $1,131,503 | $0 | $0 | $1,131,503 | 01/01/2027 | 07/28/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251196 | Bay Saint Louis Citywide Sewer Rehabilitation Project | City of Bay Saint Louis | $4,000,000 | $0 | $8,500,000 | $12,500,000 | 11/30/2024 | 07/06/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251195 | Lift Station 43 Repairs | City of Bay Saint Louis | $750,000 | $0 | $0 | $750,000 | 10/30/2024 | 07/10/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251194 | Dolphin and Sea Turtle Hospital and Enhancement of Rehabilitation Facilities at IMMS | Institute for Marine Mammal Studies, Inc. | $3,850,000 | $1,000,000 | $3,000,000 | $6,850,000 | 12/31/2025 | 02/07/2024 | 2025 | Awarded | Accepted | Yes |
| Details | 251193 | Marine Aquaculture Demonstration Center for Economic Development | The University of Southern Mississippi | $3,138,916 | $0 | $0 | $3,138,916 | 06/30/2027 | 07/28/2023 | 2025 | Accepted | Yes | |
| Details | 251192 | Development of a stock enhancement program for the Southern Flounder, Paralichthys lethostigma | The University of Southern Mississippi | $963,130 | $0 | $0 | $963,130 | 06/30/2027 | 07/28/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251191 | Mississippi Sound Coalition | Harrison County Board of Supervisors | $3,000,000 | $0 | $0 | $3,000,000 | 06/30/2026 | 07/24/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251190 | Forest Cove Sewer Improvements | City of D'Iberville | $2,923,754 | $0 | $0 | $2,923,754 | 01/01/2025 | 06/23/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 241189 | Bay St. Louis - Cedar Point Wastewater Pump Station Improvements | Hancock County Utility Authority | $1,245,000 | $0 | $0 | $1,245,000 | 06/01/2025 | 01/01/0001 | 2024 | Not Awarded | Accepted | Yes |
| Details | 241188 | Hancock County - Springwood Sewer Improvements | Hancock County Utility Authority | $3,100,000 | $0 | $0 | $3,100,000 | 06/01/2025 | 01/01/0001 | 2024 | Not Awarded | Accepted | Yes |
| Details | 251187 | Conservation and Protection of Wildlife and the Environment through Key Education and Outreach Programs | Institute for Marine Mammal Studies, Inc. | $785,000 | $0 | $0 | $785,000 | 01/01/2027 | 02/16/2024 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251186 | Graveline Bayou Inlet Restoration Study | Jackson County Board of Supervisors | $750,000 | $0 | $100,000 | $850,000 | 03/01/2025 | 07/17/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251185 | Blue Skies Living Shoreline | Land Trust for the Mississippi Coastal Plain | $618,968 | $0 | $0 | $618,968 | 01/01/2028 | 07/28/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251184 | Trautman Basin / Outfall Improvements | City of Long Beach | $2,500,000 | $0 | $0 | $2,500,000 | 01/01/2026 | 07/31/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251183 | Beach Park Pier Improvements | City of Pascagoula | $400,000 | $0 | $0 | $400,000 | 01/01/2025 | 07/06/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251182 | Drainage Improvements to Live Oak Corridor Phase 2 | City of Pascagoula | $4,832,250 | $0 | $2,000,000 | $6,832,250 | 12/01/2025 | 07/06/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251181 | Oyster Shell Recovery Initiative | RESTOREEF NPO | $175,000 | $0 | $0 | $175,000 | 07/30/2025 | 07/30/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251180 | Floating Oyster Nursery | RESTOREEF NPO | $300,000 | $0 | $0 | $300,000 | 07/31/2027 | 07/31/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251179 | Waveland - lnfill Area Infrastructure Improvements - Phase 2 | City of Waveland | $3,300,000 | $0 | $0 | $3,300,000 | 07/01/2025 | 06/23/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 251178 | Waveland - Infill Area Infrastructure Improvement - Phase 4 | City of Waveland | $2,000,000 | $0 | $0 | $2,000,000 | 12/01/2025 | 06/23/2023 | 2025 | Not Awarded | Accepted | Yes |
| Details | 2022027 | Atlantic Street Sewer Improvements | Hancock County Utility Authority | $2,721,150 | $2,721,150 | $0 | $2,721,150 | 06/01/2019 | 06/01/2019 | 2022 | Awarded | Accepted | Yes |
| Details | 2022028 | Small Craft Harbor SE Bulkhead Improvements | City of Long Beach | $2,188,000 | $2,188,000 | $0 | $2,188,000 | 05/19/2022 | 05/19/2020 | 2022 | Awarded | Accepted | Yes |
| Details | 261327 | Expansion of Sewer Services Improvements Phase 2 | Kiln Utility and Fire District | $2,452,575 | $0 | $0 | $2,452,575 | 01/01/2026 | 10/24/2024 | 2026 | Not Awarded | Submitted | In Review |
| Details | 241177 | Aquatic Research Center - improvements, research, conservation, and hurricane support | Aquatic Research Foundation (fundraising arm of Mississippi Aquarium for conservation projects) | $2,884,125 | $0 | $2,884,125 | 06/30/2027 | 06/30/2022 | 2024 | Not Awarded | Accepted | No | |
| Details | 241176 | Phase II: Nature-based Tourism with Increased Management & Stewardship for Beach-nesting & Foraging Birds | Audubon Delta | $526,879 | $0 | $526,879 | 12/31/2025 | 07/01/2022 | 2024 | Not Awarded | Accepted | Yes | |
| Details | 241175 | Bay St. Louis Rutherford Pier Extension Project | City of Bay Saint Louis | $1,750,000 | $0 | $0 | $1,750,000 | 06/30/2023 | 06/24/2022 | 2024 | Not Awarded | Accepted | No |
| Details | 241174 | Ulman Ave Beach Access and Boardwalk Improvements | City of Bay Saint Louis | $1,550,000 | $0 | $350,000 | $1,900,000 | 06/30/2023 | 06/22/2022 | 2024 | Not Awarded | Accepted | No |
| Details | 241173 | Hiller Park Nutrient Reduction and Stormwater Control | City of Biloxi | $1,300,000 | $0 | $1,300,000 | 06/30/2024 | 07/01/2022 | 2024 | Not Awarded | Accepted | Yes | |
| Details | 221172 | D'Iberville Boulevard Drainage Improvements | City of D'Iberville | $5,854,760 | $0 | $5,854,760 | 12/31/2023 | 05/14/2020 | 2022 | Not Awarded | Accepted | Yes | |
| Details | 241171 | Hickory Hills, Lagrange, and Cotita Water Quality and Stormwater Runoff Improvements | City of Gautier | $2,973,981 | $0 | $2,973,981 | 09/30/2023 | 06/06/2022 | 2024 | Not Awarded | Accepted | Yes | |
| Details | 241170 | Coffee Creek "Go Green" Park and Educational/Recreational Facility | City of Gulfport | $5,495,913 | $0 | $5,495,913 | 10/31/2023 | 02/28/2022 | 2024 | Not Awarded | Accepted | No | |
| Details | 231169 | Courthouse Rd Boat Launch Dredging & Hurricane Protection Jetty Extension | City of Gulfport | $1,900,000 | $0 | $1,900,000 | 02/17/2022 | 2023 | Not Awarded | Accepted | No | ||
| Details | 231168 | South Gulfport Wastewater Treatment Plan Rehab-Relocation | City of Gulfport | $235,000,000 | $0 | $235,000,000 | 02/22/2022 | 02/17/2022 | 2023 | Not Awarded | Accepted | No | |
| Details | 231167 | North Gulfport Wastewater Treatment Plant Sand Filter Replacement | City of Gulfport | $7,200,000 | $0 | $7,200,000 | 02/17/2022 | 2023 | Not Awarded | Accepted | Yes | ||
| Details | 231166 | North Gulfport Wastewater Treatment Plant UV Disinfection | City of Gulfport | $4,100,000 | $0 | $4,100,000 | 02/17/2022 | 2023 | Not Awarded | Accepted | Yes | ||
| Details | 231165 | Forest Heights Levee Project | City of Gulfport | $6,650,000 | $0 | $6,650,000 | 02/17/2022 | 2023 | Not Awarded | Accepted | Yes | ||
| Details | 231164 | Richards Bayou Dredging and Brickyard Bayou/Bayou View Drive Dredging Project | City of Gulfport | $756,608 | $0 | $6,650,000 | 02/17/2022 | 2023 | Not Awarded | Accepted | No | ||
| Details | 231163 | Brickyard Bayou Phase 2-D Improvements | City of Gulfport | $4,000,000 | $0 | $4,000,000 | 02/17/2022 | 2023 | Not Awarded | Accepted | No | ||
| Details | 231162 | Gulfport Beach 20th Ave Phase III Hurricane Protection Jetty Project | City of Gulfport | $4,500,000 | $0 | $4,500,000 | 02/17/2022 | 2023 | Not Awarded | Accepted | No | ||
| Details | 231161 | Highway 90 Multimodal Overpass to Jones Park | City of Gulfport | $6,000,000 | $0 | $6,000,000 | 02/17/2022 | 2023 | Not Awarded | Accepted | No | ||
| Details | 231160 | Hancock County Port and Harbor Commission Mitigation Bank | Hancock County Port & Harbor Commission | $1,249,220 | $0 | 01/05/2022 | 2023 | Not Awarded | Accepted | No | |||
| Details | 231159 | Project 5.16 - Bayou Bacon at Hoda Road | Hancock County Board of Supervisors | $148,900 | $0 | $148,900 | 10/05/2021 | 2023 | Not Awarded | Accepted | No | ||
| Details | 231158 | Project 4.13 - Harbor Drive | Hancock County Board of Supervisors | $228,860 | $0 | $228,860 | 10/01/2021 | 2023 | Not Awarded | Accepted | Yes | ||
| Details | 231157 | Project 5.17 - Parker Drive | Hancock County Board of Supervisors | $263,080 | $0 | $263,080 | 10/05/2021 | 2023 | Not Awarded | Accepted | No | ||
| Details | 231156 | Project 4.09 - Stennis Airport Road | Hancock County Board of Supervisors | $296,900 | $0 | $296,900 | 10/05/2021 | 2023 | Not Awarded | Accepted | No | ||
| Details | 231155 | Project 4.11 - Stennis Airport South of Runway | Hancock County Board of Supervisors | $328,100 | $0 | $328,100 | 10/05/2021 | 2023 | Not Awarded | Accepted | No | ||
| Details | 241154 | Harrison County Beach Outfall Improvements | Harrison County Board of Supervisors | $2,160,000 | $1,600,000 | 06/28/2022 | 2024 | Awarded | Accepted | Yes | |||
| Details | 231153 | Asbestos Water Pipe Replacement | Hancock County Water and Sewer District | $2,100,000 | $0 | $2,100,000 | 06/16/2022 | 2023 | Not Awarded | Accepted | Yes | ||
| Details | 231152 | Pascagoula Beach Open Channel Outfalls | Jackson County Board of Supervisors | $1,339,000 | $0 | $1,339,000 | 03/09/2022 | 2023 | Not Awarded | Accepted | Yes | ||
| Details | 231151 | Jackson County Septic System Abatement Phase I | Jackson County Utility Authority | $1,800,000 | $1,800,000 | $1,800,000 | 07/14/2021 | 2023 | Awarded | Accepted | Yes | ||
| Details | 231150 | Jourdan River Shores Sewer Improvements Phase II | Kiln Utility and Fire District | $2,255,600 | $0 | $2,255,600 | 06/16/2022 | 2023 | Not Awarded | Accepted | Yes | ||
| Details | 231149 | Sewer Collection System along Hwy 603 from Hwy 43 to Fire Tower Rd | Kiln Utility and Fire District | $963,093 | $0 | $963,093 | 01/21/2022 | 2023 | Not Awarded | Accepted | No | ||
| Details | 261324 | Sioux Bayou Landing Erosion Control | Sioux Bayou Landing RV Resort, LLC | $375,000 | $0 | $0 | $375,000 | 07/01/2025 | 09/28/2024 | 2026 | Submitted | In Review | |
| Details | 261325 | Hancock County - Springwood Sewer Improvements | Hancock County Utility Authority | $3,300,000 | $0 | $0 | $3,300,000 | 06/01/2026 | 11/14/2024 | 2026 | Submitted | In Review | |
| Details | 261326 | Unmanned Hydrographic Field Methods for Benthic Mapping and Monitoring | Pearl River Community College | $2,300,000 | $0 | $0 | $2,300,000 | 06/30/2030 | 02/06/2025 | 2026 | Submitted | Yes | |
| Details | 261328 | Dolphin and Sea Turtle Hospital and Enhancement of Rehabilitation Facilities at IMMS | Institute for Marine Mammal Studies, Inc. | $2,850,000 | $4,000,000 | $6,850,000 | 12/31/2026 | 02/07/2025 | 2026 | Submitted | Yes | ||
| Details | 231148 | Mid-Breton Sound & Bonnet Carre Response with WSSC | Mississippi Department of Marine Resources | $874,240 | $874,240 | $874,240 | 06/30/2025 | 01/18/2022 | 2023 | Awarded | Accepted | Yes | |
| Details | 241153 | Coastal River Protection | City of Moss Point | $1,000,000 | $0 | $1,000,000 | 12/31/2026 | 07/31/2023 | 2024 | Not Awarded | Accepted | In Review | |
| Details | 271325 | Artificial Reef Construction and Dive Monitoring | Mississippi Gulf Fishing Banks, Inc. (MGFB) | $250,000 | $200,000 | $450,000 | 07/01/2028 | 06/20/2025 | 2027 | Submitted | |||
| Details | 271326 | Developing model-based decision support tools and advancing understanding of tipping points in coastal wetlands | The University of Southern Mississippi | $342,715 | $342,715 | 12/31/2028 | 06/20/2025 | 2027 | Submitted | ||||
| Details | 271327 | Singing River Mall Property Stormwater | City of Gautier | $2,941,675 | $2,941,675 | 06/30/2027 | 06/26/2025 | 2027 | Submitted | ||||
| Details | 271328 | City of D'Iberville Watershed Protection Plan | City of D'Iberville | $350,000 | $350,000 | 10/31/2028 | 06/27/2025 | 2027 | Submitted | ||||
| Details | 271329 | D'Iberville Working Waterfront and Commercial Seafood Harbor | City of D'Iberville | $2,000,000 | $14,000,000 | $25,000,000 | 06/30/2027 | 06/27/2025 | 2027 | Submitted | |||
| Details | 271330 | City of D'Iberville Forrest Cove Sewer Improvements | City of D'Iberville | $3,280,000 | $3,280,000 | 01/01/2028 | 06/27/2025 | 2027 | Submitted | ||||
| Details | 271331 | MOSS POINT NORTH SHORELINES ENHANCEMENTS | City of Moss Point | $1,800,000 | $1,800,000 | 12/31/2027 | 06/27/2025 | 2027 | Submitted | ||||
| Details | 271332 | Evaluation and Monitoring of Marine Mammal Health in the Mississippi Sound | Mississippi State University | $1,721,529 | $1,721,529 | 09/30/2028 | 06/30/2025 | 2027 | Submitted | ||||
| Details | 271333 | Long Beach Smallcraft Harbor – Northwestern Bulkhead | City of Long Beach | $2,500,000 | $500,000 | $3,000,000 | 03/01/2028 | 06/30/2025 | 2027 | Submitted | |||
| Details | 271334 | Dock C Bulkhead Replacement | Hancock County Port & Harbor Commission | $4,000,000 | $500,000 | $4,500,000 | 10/31/2027 | 07/02/2025 | 2027 | Submitted | |||
| Details | 271335 | Mississippi Coastal Fishery Resource Assessment Program | University of Southern Mississippi | $709,869 | $709,869 | 06/30/2027 | 07/14/2025 | 2027 | Submitted | ||||
| Details | 271336 | Diamondhead Drainage, Flood Prevention & Water Quality Improvement Project Phase III | City of Diamondhead | $2,000,000 | $2,000,000 | 12/31/2028 | 07/30/2025 | 2027 | Submitted | ||||
| Details | 271337 | HANCOCK CUA - RENOVATIONS AND UPGRADES TO SOUTHERN REGIONAL WWTP | Hancock County Utility Authority | $1,000,000 | $1,000,000 | 06/30/2028 | 07/31/2025 | 2027 | Submitted | ||||
| Details | 271338 | HANCOCK CUA - SOUTHERN WWTF EQUALIZATION TANK IMPROVEMENTS | Hancock County Utility Authority | $1,200,000 | $1,200,000 | 06/30/2025 | 07/31/2025 | 2027 | Submitted | ||||
| Details | 271339 | Cambridge Square Water Quality and Stormwater Runoff Improvements | City of Gautier | $4,519,656 | $4,519,656 | 12/31/2028 | 07/31/2025 | 2027 | Submitted | ||||
| Details | 271340 | Bayside Marina Development – Phase I (10-Slip Marina & Estuarine Restoration) | Gutierrez, LLC | $1,750,000 | $1,750,000 | 12/31/2026 | 08/01/2025 | 2027 | Submitted | ||||
| Details | 271341 | Biloxi Boardwalk | Harrison County Board of Supervisors | $4,500,000 | $4,500,000 | 12/31/2028 | 08/07/2025 | 2027 | Submitted | ||||
| Details | 271342 | Monitoring finfish space use and sediment classification to inform coastal restoration efforts | University of Southern Mississippi | $752,657 | $752,657 | 12/31/2029 | 08/12/2025 | 2027 | Submitted | ||||
| Details | 271343 | USM Research and Teaching Vessel | The University of Southern Mississippi, Gulf Coast Research Laboratory | $15,000,000 | $2,500,000 | $17,500,000 | 06/30/2030 | 08/22/2025 | 2027 | Submitted | |||
| Details | 271346 | Development of a stock enhancement program for the Southern Flounder, Paralichthys lethostigma | The University of Southern Mississippi | $1,203,837 | $1,203,837 | 06/30/2029 | 08/27/2025 | 2027 | Submitted | ||||
| Details | 271348 | Escatawpa Septic System Abatement for Pascagoula River Watershed Protection & Water Quality Improvement | Jackson County Utility Authority | $2,800,000 | $2,800,000 | 06/30/2029 | 08/28/2025 | 2027 | Submitted | ||||
| Details | 271349 | Escatawpa Wastewater Infrastructure Rehabilitation for Coastal Water Quality Improvement | Jackson County Utility Authority | $2,800,000 | $2,800,000 | 06/30/2029 | 08/28/2025 | 2027 | Submitted | ||||
| Details | 271350 | Artificial Reef Enhancement MS Sound | Mississippi Department of Marine Resources | $1,200,000 | $200,000 | $1,400,000 | 06/30/2028 | 09/08/2025 | 2027 | Submitted | |||
| Details | 271351 | The Diamondback Terrapin: A Unique Mississippi Species to Investigate Marsh Health | Institute for Marine Mammal Studies, Inc. | $2,500,000 | $2,500,000 | 09/30/2031 | 09/10/2025 | 2027 | Submitted | ||||
| Details | 271353 | Graveline Bayou Inlet Restoration Study | Jackson County Board of Supervisors | $750,000 | $100,000 | $850,000 | 07/31/2027 | 09/16/2025 | 2027 | Submitted | |||
| Details | 271354 | Signet Bulkhead Repair and Renovation Project | Jackson County Board of Supervisors | $4,000,000 | $8,215,810 | $12,215,810 | 11/30/2029 | 09/16/2025 | 2027 | Submitted | |||
| Details | 271355 | Bernard Bayou Seaway Dredge and Boat | Harrison County Development Commission | $1,950,000 | $1,950,000 | 06/30/2027 | 09/24/2025 | 2027 | Submitted | ||||
| Details | 271356 | Mississippi Gulf Coast Advanced Research and Development Trust Fund | Harrison County Board of Supervisors | $10,000,000 | $10,000,000 | 06/30/2031 | 09/26/2025 | 2027 | Submitted | ||||
| Details | 271357 | Using Satellite and Acoustic Tags to Study Population Dynamics, Habitat Use, and Human Interactions for Sea Turtles in the Mississippi Sound | Institute for Marine Mammal Studies, Inc. | $1,500,000 | $1,500,000 | 12/31/2029 | 09/26/2025 | 2027 | Submitted | ||||
| Details | 271358 | Jones Park Sanitary Lift Station Renovation Project | City of Gulfport | $2,000,000 | $2,000,000 | 03/31/2028 | 09/29/2025 | 2027 | Submitted | ||||
| Details | 271359 | Gulfport Harbor Fuel Dock & Equipment Replacement Project | City of Gulfport | $3,500,000 | $3,500,000 | 03/31/2028 | 09/29/2025 | 2027 | Submitted | ||||
| Details | 271360 | Mississippi Sound Public Oyster Reef Habitat Survey | National Oceans Applications Research Center (NOARC) | $731,780 | $731,780 | 06/30/2027 | 09/29/2025 | 2027 | Submitted | ||||
| Details | 271361 | Citywide Sanitary Lift Station Rehabilitation Project | City of Gulfport | $2,500,000 | $2,500,000 | 06/30/2028 | 09/29/2025 | 2027 | Submitted | ||||
| Details | 271362 | Citywide Sewer Infrastructure Cast In Place Pipe Improvements Project | City of Gulfport | $3,100,000 | $3,100,000 | 03/31/2028 | 09/29/2025 | 2027 | Submitted | ||||
| Details | 271363 | Turkey Creek Pump Station Sewer Area Inflow and Infiltration Improvements | City of Gulfport | $2,500,000 | $2,500,000 | 10/31/2027 | 09/29/2025 | 2027 | Submitted | ||||
| Details | 271364 | Coleman Avenue Storm Risk Reduction Project | City of Waveland | $5,000,000 | $5,000,000 | 10/31/2028 | 09/29/2025 | 2027 | Submitted | ||||
| Details | 271365 | Citywide Sewer Interceptor Assessment & Implementation Project | City of Gulfport | $2,500,000 | $2,500,000 | 03/31/2029 | 09/29/2025 | 2027 | Submitted | ||||
| Details | 271352 | Jackson County Estuary Habitat Restoration - Containment Berm Project | Jackson County Board of Supervisors | $2,000,000 | $2,600,000 | 12/31/2026 | 09/16/2025 | 2027 | Submitted | ||||
| Details | 271366 | Enhancing Coastal Trails and Conservation Education in Moss Point, Jackson County | National Audubon Society | $499,821 | $499,821 | 03/31/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271367 | Direct Oyster Larval Setting for Accelerated Reef Restoration in Mississippi Sound | Callie Mae Sea Foundation | $1,370,000 | $1,370,000 | 12/31/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271368 | Sherman Canaan Fishing Dock Improvements | City of Biloxi | $6,583,885 | $6,583,885 | 12/31/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271369 | OS Arborist - Beautification and Protection | City of Ocean Springs | $365,000 | $365,000 | 12/31/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271370 | Discovery On The Green: Coastal Conservation for Mississippi's Future | Lynn Meadows Discovery Center | $1,874,723 | $1,874,723 | 11/30/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271371 | 2026 City Wide Sanitary Sewer Improvements | City of Pass Christian | $6,200,000 | $6,200,000 | 07/31/2027 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271372 | 2026 Harbor Bulkhead Wall Replacement and Improvements | City of Pass Christian | $5,400,000 | $5,400,000 | 07/31/2027 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271373 | Long Beach-Pass Christian WWTP Headworks Rehabilitation | Harrison County Utility Authority (HCUA) | $7,900,000 | $7,900,000 | 03/31/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271374 | Long Beach-Pass Christian WWTP New Headworks | Harrison County Utility Authority (HCUA) | $15,800,000 | $15,800,000 | 04/30/2029 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271375 | Center City Infrastructure Improvements - Phase II | City of Waveland | $3,950,000 | $3,950,000 | 12/31/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271376 | Gulf Blue MAC Maritime AI & Robotics Operations Center (MAIROC) | University of Southern Mississippi Research Foundation | $4,995,189 | $4,995,189 | 06/30/2031 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271377 | North and South Gulfport WWTPs Improvements | Harrison County Utility Authority (HCUA) | $1,800,000 | $1,800,000 | 04/30/2027 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271378 | Long Beach Smallcraft Harbor – West Jetty Hardening | City of Long Beach | $2,453,900 | $2,453,900 | 03/31/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271379 | Lighthouse Boardwalk | City of Biloxi, Mississippi | $2,000,000 | $2,000,000 | 10/31/2028 | 09/30/2025 | 2027 | Submitted | ||||
| Details | 271380 | Western Regional Wastewater Treatment Facility Expansion | Hancock County Utility Authority | $12,000,000 | $12,000,000 | 06/30/2029 | 10/14/2025 | 2027 | Submitted | ||||
| Details | 271381 | Long Beach Smallcraft Harbor – Electrical Platforms | City of Long Beach | $2,499,000 | $2,499,000 | 08/31/2026 | 10/14/2025 | 2027 | Submitted |