GOMESA Application Details
- 1. Title of Project
- Harbor Repairs and Improvements
- 2. Location of Project
- 100 Jody Compretta Drive Bay St Louis, MS 39520
- 3. Requesting Organization
- City of Bay St Louis
- 4a. Name
- Mike Favre
- 4b. Position
- 4c. Phone Number
- (228) 466-5490
- 4d. Fax Number
- 4e. Address Line 1
- 688 Highway 90
- 4e. Address Line 2
- 4e. City, State Zip
- Bay St. Louis , MS
- 4f. Email
- mfavre@baystlouis-ms.gov
- 5. FundingRequested
- $1,200,000
- Awarded Amount:
- $0
- 6. Other State or Federal Funding Sources
- No
- 7a. Amount of Additional Funds
- $0
- 7b. Source of Additional Funds
- 8. Total Project Funds Amount
- $1,200,000
- 9. Project Description/Overview
- This City of Bay St. Louis is proposing a project that addresses the settlement of the harbor sidewalks, which has led to the sidewalk to become uneven. Due to the unevenness, this has resulted in safety risks and becoming non ADA compliant. The project includes demolition and excavation of the existing sidewalk and asphalt, followed by the installation of geofabric, new backfill, sand, and reconstruction of the sidewalk. These measures are intended to create a stable hurricane resistant infrastructure, and resolves an emergency situation by removing obstructions and hazards to pedestrian access to the harbor.
- 10. Project Goals/Objectives
- - Hurricane Mitigation and Resilience - Safe Public Access
- 11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
- (A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
- Yes: This proposed project will provide hurricane mitigation and resilience by utilizing hurricane resistant materials for long term stability of the Harbor infrastructure.
- (B) Mitigation of damage to fish, wildlife, or natural resources.
- (C) Implementation of a federally-approved marine, coastal, or conservation management plan.
- (D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
- 12. Project Timetable/Milestones
- Design and Planning - 3 months Construction - 6 months Closeout - 1 month
- 13. Project Timing
- Short-term
- 14. Current status of architectural/engineering plans & specifications for this project (if applicable):
- In Progress Funds Not Budgeted
- 15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
- This proposed project provides safe area for pedestrians to access coastal waters for fishing activities thus preventing future damage to existing natural resources. This sidewalk project will be reconstructed to withstand hurricane forces allowing many generations to experience the Bay St. Louis Harbor.
- 16. Estimated Years To Completion
- 1
- 17. Estimated Completion Date
- 1/31/2026
- Budget:
- Salaries,Wages, Fringe
- $0
- Travel
- $0
- Architecture & Engineering
- $120,000
- Legal
- $0
- Consulting
- $0
- Construction
- $1,080,000
- Site Work
- $0
- Equipment
- $0
- Indirects
- $0
- Other
- $0
- Total
- $1,200,000
- Internal Project Number
- 1285
- Application Submission Date
- 06/19/2024
- Fiscal Year
- 2026
- Project Status
- Application Status
- Submitted
- Meets Criteria
- Internal Notes: