GOMESA Application Details


Internal Project Number
271331
1. Title of Project
MOSS POINT NORTH SHORELINES ENHANCEMENTS
2. Location of Project
City of Moss Point, Mississippi, shoreline near the Pelican Landing Conference Center, Highway 613, Moss Point, Jackson County, Mississippi
3. Requesting Organization
City of Moss Point
4a. Name
BILLY KNIGHT
4b. Position
4c. Phone Number
2284742345
4d. Fax Number
4e. Address Line 1
4320 MCINNIS AVE
4e. Address Line 2
4e. City, State Zip
MOSS POINT, Mississippi
4f. Email
BILLY.KNIGHT@CITYOFMOSSPOINT.ORG
5. FundingRequested
$1,800,000
Awarded Amount:
6. Other State or Federal Funding Sources
No
7a. Amount of Additional Funds
7b. Source of Additional Funds
8. Total Project Funds Amount
$1,800,000
9. Project Description/Overview
The project will provide coastal protection, conservation, coastal restoration, hurricane protection, and infrastructure for coastal wetlands. A pier will be constructed along the existing shoreline. The pier will be constructed of timber piling, timber framing, and a composite material deck. The timber piles and composite decking material will be longer lasting and resilient to flooding events, tropical storms and hurricanes. Improvements will be made along the wetland area to protect the shoreline via a turn down sidewalk. The sidewalk will also function as a recreational opportunity.
10. Project Goals/Objectives
The project goals and objectives are centered on the GOMESA program ideals to protect and conserve coastal resources.
11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
(A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
Yes: Moss Point's river systems are the city's greatest asset. The project is specifically designed to protect the shoreline and marsh grass, provide coastal conservation, restore damaged infrastructure, enhance hurricane protection to existing infrastructure. The areas to be protected are prone to erosion and are especially vulnerable to river flood events, tropical storms and hurricanes. The project will also reduce frequent maintenance as experienced by the existing structures. The new concrete and sidewalk turndown structures are designed to make the site less vulnerable to these events. The locations are highly visible and are used by residents and visitors.
(B) Mitigation of damage to fish, wildlife, or natural resources.
(C) Implementation of a federally-approved marine, coastal, or conservation management plan.
(D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
12. Project Timetable/Milestones
The project is designed to be completed in less than two years. Milestones include: * Acceptance of award by the Board of Aldermen * Advertisement of bids * Award of contracts * Begin construction * Complete the project * Ribbon Cutting, marketing and promotion of project success.
13. Project Timing
Short-term
14. Current status of architectural/engineering plans & specifications for this project (if applicable):
In Progress Funds Budgeted
15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
The criteria is met specifically by the construction materials and methods at vulnerable sites that will enhance, protect and conserve the marine interest of Mississippi for present and future generations. The site is currently being underutilized, with limited access to the river. The new pier and other enhancements will help promote use of the site and attract tourists.
16. Estimated Years To Completion
2
17. Estimated Completion Date
12/31/2027
Budget:
Salaries,Wages, Fringe
Travel
Architecture & Engineering
$256,750
Legal
Consulting
Construction
Site Work
$1,423,250
Equipment
Indirects
Other
$120,000
Total
$1,800,000
Application Submission Date
06/27/2025
Fiscal Year
2027
Project Status
Application Status
Submitted
Meets Criteria
Internal Notes:
Attachments:
https://gomesa_internal/attachments/GOMESA_1331_COMPLETE.pdf
Hyperlink:
Attachments
Back to List
An unhandled error has occurred. Reload 🗙