GOMESA Application Details


1. Title of Project
Bay St. Louis Citywide Sewer Rehabilitation Project
2. Location of Project
Bay St. Louis
3. Requesting Organization
Bay St. Louis
4a. Name
Mike Favre
4b. Position
4c. Phone Number
(228) 466-5490
4d. Fax Number
4e. Address Line 1
688 Highway 90
4e. Address Line 2
4e. City, State Zip
Bay St. Louis, MS
4f. Email
mfavre@baystlouis-ms.gov
5. FundingRequested
$4,000,000
Awarded Amount:
$0
6. Other State or Federal Funding Sources
Yes
7a. Amount of Additional Funds
$8,500,000
7b. Source of Additional Funds
ARPA/MCWI
8. Total Project Funds Amount
$12,500,000
9. Project Description/Overview
The maintenance of the Bay Saint Louis sewer system is imperative to insure the prevention of overflow from the system to the ground and the surrounding drainage system. This project is to include the inspection and lining of gravity sewer mains and manholes, the lining of all sewer pump stations, the rehabilitation of older lift stations, targeting areas of extraneous flow, and addressing structural defects. Preliminary design, cleaning, and CCTV inspection of the system is completed. Currently, Phase 2 repairs for a portion of the city are being finalized and will advertise for construction bids in July 2024.
10. Project Goals/Objectives
Provide a safe and efficient collection of wastewater for the City of Bay Saint Louis by rehabbing the city's sewer system. Protecting the groundwater from contamination, prevent overflow of city's drainage system and decreased runtime and wear and tear on the pumping station.
11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
(A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
Yes: Maintenance of the city's sewer will prevent potential contamination of groundwater from wastewater overflow from the system to the surrounding drainage system.
(B) Mitigation of damage to fish, wildlife, or natural resources.
Yes: Protecting the groundwater mitigates the loss of fish, wildlife and natural resources.
(C) Implementation of a federally-approved marine, coastal, or conservation management plan.
(D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
12. Project Timetable/Milestones
Design and Planning - 3 months Construction - 6 months Closeout - 1 month
13. Project Timing
Short-term
14. Current status of architectural/engineering plans & specifications for this project (if applicable):
In Progress Funds Not Budgeted
15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
Maintenance of the Bay Saint Louis sewer system is imperative to insure the prevention of overflow from the system to the ground. Prevention of this overflow protects the groundwater from contamination and prevents local flooding of the surrounding drainage system.
16. Estimated Years To Completion
1
17. Estimated Completion Date
11/30/2025
Budget:
Salaries,Wages, Fringe
$0
Travel
$0
Architecture & Engineering
$400,000
Legal
$0
Consulting
$3,600,000
Construction
$0
Site Work
$0
Equipment
$0
Indirects
$0
Other
$0
Total
$4,000,000
Internal Project Number
1284
Application Submission Date
06/19/2024
Fiscal Year
2026
Project Status
Application Status
Submitted
Meets Criteria
Internal Notes:
Back to List