GOMESA Application Details


Internal Project Number
281412
1. Title of Project
City Park Pier Replacement
2. Location of Project
Gautier, MS, located at the end of Pointe Bayou Rd.
3. Requesting Organization
City of Gautier
4a. Name
Samuel King
4b. Position
4c. Phone Number
(228) 497-8000
4d. Fax Number
4e. Address Line 1
3330 Hwy 90
4e. Address Line 2
4e. City, State Zip
Gautier, Mississippi
4f. Email
sking@gautier-ms.gov
5. FundingRequested
$2,000,000
Awarded Amount:
6. Other State or Federal Funding Sources
No
7a. Amount of Additional Funds
7b. Source of Additional Funds
8. Total Project Funds Amount
$2,000,000
9. Project Description/Overview
This project proposes the replacement of an existing aged and damaged timber pier with a resilient, long-term reinforced concrete pile and flow-through composite decking. The existing timber pier has significant structural deterioration due to age and storm events. Several structural members are compromised and limiting safe public access. The City of Gautier is currently making minimal repairs to sections to allow safe access to the public, but is becoming financially unsustainable.
10. Project Goals/Objectives
1. Increase structural resilience 2. Reduce long-term maintenance cost 3. Improve Public Safety 4. Supporting sustainable public access to coastal waters
11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
(A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
Yes: The upgrades to concrete piles and flow through decking directly improve the resilience to hurricanes ,as well as, increased exposure to wave energy and storm surge resulting from wetland losses.
(B) Mitigation of damage to fish, wildlife, or natural resources.
Yes: Flow-through decking allows more sunlight to penetrate into the water below. Minimizing shading impacts to aquatic vegetation and other habitats. Increased design life of concrete piles reduces the frequency of future marine construction limiting cumulative environmental disturbance.
(C) Implementation of a federally-approved marine, coastal, or conservation management plan.
(D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
12. Project Timetable/Milestones
Hydro graphic / Topographic Surveying: In Progress Engineering Design and Permitting: 8 Months Construction: 12 Months *Project Schedule attached to application
13. Project Timing
Short-term
14. Current status of architectural/engineering plans & specifications for this project (if applicable):
In Progress Funds Not Budgeted
15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
This project meets several goals and objectives of the Department of Marine Resources. To enhance, protect, and conserve Mississippi’s marine interests for present and future generations by strengthening coastal infrastructure resilience and reducing environmental impacts.
16. Estimated Years To Completion
2
17. Estimated Completion Date
1/31/2029
Budget:
Salaries,Wages, Fringe
$0
Travel
$0
Architecture & Engineering
$325,000
Legal
$0
Consulting
$0
Construction
$1,675,000
Site Work
$0
Equipment
$0
Indirects
$0
Other
$0
Total
$2,000,000
Application Submission Date
07/31/2026
Fiscal Year
2028
Project Status
Application Status
Submitted
Meets Criteria
Internal Notes:
Attachments:
https://gomesa.dmr.ms.gov/attachments/GOMESA_1412_Attachment.pdf