GOMESA Application Details
- Internal Project Number
- 281412
- 1. Title of Project
- City Park Pier Replacement
- 2. Location of Project
- Gautier, MS, located at the end of Pointe Bayou Rd.
- 3. Requesting Organization
- City of Gautier
- 4a. Name
- Samuel King
- 4b. Position
- 4c. Phone Number
- (228) 497-8000
- 4d. Fax Number
- 4e. Address Line 1
- 3330 Hwy 90
- 4e. Address Line 2
- 4e. City, State Zip
- Gautier, Mississippi
- 4f. Email
- sking@gautier-ms.gov
- 5. FundingRequested
- $2,000,000
- Awarded Amount:
- 6. Other State or Federal Funding Sources
- No
- 7a. Amount of Additional Funds
- 7b. Source of Additional Funds
- 8. Total Project Funds Amount
- $2,000,000
- 9. Project Description/Overview
- This project proposes the replacement of an existing aged and damaged timber pier with a resilient, long-term reinforced concrete pile and flow-through composite decking. The existing timber pier has significant structural deterioration due to age and storm events. Several structural members are compromised and limiting safe public access. The City of Gautier is currently making minimal repairs to sections to allow safe access to the public, but is becoming financially unsustainable.
- 10. Project Goals/Objectives
- 1. Increase structural resilience 2. Reduce long-term maintenance cost 3. Improve Public Safety 4. Supporting sustainable public access to coastal waters
- 11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
- (A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
- Yes: The upgrades to concrete piles and flow through decking directly improve the resilience to hurricanes ,as well as, increased exposure to wave energy and storm surge resulting from wetland losses.
- (B) Mitigation of damage to fish, wildlife, or natural resources.
- Yes: Flow-through decking allows more sunlight to penetrate into the water below. Minimizing shading impacts to aquatic vegetation and other habitats. Increased design life of concrete piles reduces the frequency of future marine construction limiting cumulative environmental disturbance.
- (C) Implementation of a federally-approved marine, coastal, or conservation management plan.
- (D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
- 12. Project Timetable/Milestones
- Hydro graphic / Topographic Surveying: In Progress Engineering Design and Permitting: 8 Months Construction: 12 Months *Project Schedule attached to application
- 13. Project Timing
- Short-term
- 14. Current status of architectural/engineering plans & specifications for this project (if applicable):
- In Progress Funds Not Budgeted
- 15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
- This project meets several goals and objectives of the Department of Marine Resources. To enhance, protect, and conserve Mississippi’s marine interests for present and future generations by strengthening coastal infrastructure resilience and reducing environmental impacts.
- 16. Estimated Years To Completion
- 2
- 17. Estimated Completion Date
- 1/31/2029
- Budget:
- Salaries,Wages, Fringe
- $0
- Travel
- $0
- Architecture & Engineering
- $325,000
- Legal
- $0
- Consulting
- $0
- Construction
- $1,675,000
- Site Work
- $0
- Equipment
- $0
- Indirects
- $0
- Other
- $0
- Total
- $2,000,000
- Application Submission Date
- 07/31/2026
- Fiscal Year
- 2028
- Project Status
- Application Status
- Submitted
- Meets Criteria
- Internal Notes:
- Attachments:
- https://gomesa.dmr.ms.gov/attachments/GOMESA_1412_Attachment.pdf
- Hyperlink: