GOMESA Application Details
- Internal Project Number
- 281410
- 1. Title of Project
- Long Beach - Highway 90 Hurricane Mitigation Improvements - Phase 1
- 2. Location of Project
- 30°20'8.04"N / 89°10'31.68"W
- 3. Requesting Organization
- City of Long Beach
- 4a. Name
- Timothy I. Pierce
- 4b. Position
- 4c. Phone Number
- 2288631556
- 4d. Fax Number
- 4e. Address Line 1
- PO Box 929
- 4e. Address Line 2
- 4e. City, State Zip
- Long Beach, Mississippi
- 4f. Email
- mayor@longbeachms.gov
- 5. FundingRequested
- $2,815,000
- Awarded Amount:
- 6. Other State or Federal Funding Sources
- No
- 7a. Amount of Additional Funds
- 7b. Source of Additional Funds
- 8. Total Project Funds Amount
- $2,815,000
- 9. Project Description/Overview
- The City of Long Beach proposes to construct Phase I of the Highway 90 Hurricane Mitigation Improvements project along the south side of U.S. Highway 90 between Oak Alley Lane and S. Island View Drive. The project will construct a concrete beachfront pathway with an integrated concrete stem wall designed to reduce the damaging effects of storm surge, beach erosion, and windblown sand on U.S. Highway 90 and its associated drainage infrastructure. The stem wall will provide an additional layer of protection for this critical coastal transportation corridor by reducing the potential for roadway undermining during hurricane and tropical storm events while helping to limit the movement of windblown sand onto the highway. These improvements will enhance highway safety, improve drainage system performance, reduce maintenance demands, and strengthen the long-term resilience of public infrastructure exposed to coastal hazards. In addition to its hurricane protection benefits, the project will improve public access to the beachfront through the construction of a continuous pedestrian pathway and help preserve coastal resources by reducing beach erosion and sand displacement. As part of a larger phased initiative, the project will contribute to a connected system of coastal resilience improvements along the Long Beach shoreline.
- 10. Project Goals/Objectives
- Project Goals and Objectives Goal 1: Protect Critical Coastal Infrastructure Construct hurricane mitigation improvements that protect U.S. Highway 90 and associated drainage infrastructure from storm surge, shoreline erosion, and coastal storm impacts. Goal 2: Enhance Hurricane and Storm Resilience Reduce the potential for roadway undermining during hurricanes and tropical storm events through the construction of a concrete pathway and integrated stem wall system. Goal 3: Improve Public Safety and Stormwater Functionality Minimize windblown sand accumulation within U.S. Highway 90 travel lanes and drainage systems, improving roadway safety, maintaining positive drainage, and reducing maintenance requirements. Goal 4: Preserve Coastal Resources Help retain beach sand and reduce erosion, supporting the long-term stability of the shoreline and preservation of coastal habitat, including sea turtle nesting areas. Goal 5: Improve Public Access and Recreation Expand and connect the beachfront pedestrian pathway system, providing enhanced public access to Long Beach's waterfront and recreational resources. Goal 6: Support Regional Coastal Resilience Efforts Advance the City's long-term strategy of constructing continuous hurricane mitigation improvements along the beachfront while complementing similar coastal protection measures being implemented throughout Harrison County.
- 11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
- (A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
- Yes: This project is specifically intended to provide hurricane mitigation and coastal protection benefits along U.S. Highway 90, one of Mississippi's primary coastal transportation corridors. The proposed concrete pathway and integrated stem wall will help protect the highway and associated stormwater infrastructure from storm surge, beach erosion, and roadway undermining caused by hurricanes and tropical storms. By reducing the vulnerability of critical public infrastructure to coastal hazards, the project directly supports GOMESA's authorized use for hurricane protection and infrastructure affected by coastal processes. The project will also reduce the deposition of windblown sand onto U.S. Highway 90, improving roadway safety, maintaining drainage system functionality, and reducing maintenance requirements following coastal storm events. As part of a long-term strategy to create a continuous system of coastal resilience improvements along the Long Beach shoreline, the project will enhance the protection and sustainability of public infrastructure exposed to Gulf Coast conditions.
- (B) Mitigation of damage to fish, wildlife, or natural resources.
- Yes: The project will help preserve coastal beach resources by reducing sand loss and erosion along the shoreline. By stabilizing portions of the beachfront and limiting the movement of beach sand during storm events, the project will support the longterm protection of coastal habitat and natural resources. The project is also expected to help preserve nesting habitat utilized by sea turtles and other coastal species that depend upon stable beach conditions.
- (C) Implementation of a federally-approved marine, coastal, or conservation management plan.
- (D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
- 12. Project Timetable/Milestones
- Project Timetable / Milestones The City of Long Beach proposes to construct Phase I of the Highway 90 Hurricane Mitigation Improvements project to provide additional protection for U.S. Highway 90 and associated coastal infrastructure from storm surge, erosion, and windblown sand. Following grant award, the City will complete final engineering and permitting activities, procure a construction contractor, construct the pathway and integrated stem wall improvements, and complete project closeout and reporting. The project is anticipated to be completed within approximately twenty-four (24) months of grant award and authorization to proceed. Project Milestones GOMESA Grant Award and Grant Agreement Execution -- Months 0-2 Completion of Final Design and Required Permitting -- Months 2-6 Receipt of Construction Bids -- Months 7-8 Highway 90 Hurricane Mitigation Improvements Construction -- Months 9-19 Project Closeout and Final Grant Reporting -- Months 20-24 The proposed project represents the next phase of the City's ongoing effort to construct a continuous system of hurricane mitigation improvements along the beachfront. Upon completion, the project will provide enhanced protection for U.S. Highway 90, improve roadway safety, reduce maintenance demands associated with storm events and windblown sand, and strengthen the long-term resilience of critical coastal infrastructure.
- 13. Project Timing
- Short-term
- 14. Current status of architectural/engineering plans & specifications for this project (if applicable):
- Other Scope identified, but no work begun yet Funds Not Budgeted
- 15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
- The Highway 90 Hurricane Mitigation Improvements Phase I project supports the Mississippi Department of Marine Resources' mission by protecting coastal infrastructure, preserving coastal resources, and enhancing the long-term resilience of Mississippi's shoreline. The project will construct hurricane mitigation measures designed to reduce the impacts of storm surge, erosion, and windblown sand on U.S. Highway 90, a critical transportation corridor located immediately adjacent to the Gulf Coast. These improvements will help protect public infrastructure, maintain safe access along the coast, and reduce the impacts of coastal storm events. The project also supports the Department's goal of conserving Mississippi's marine interests by helping retain beach sand, reducing shoreline degradation, and protecting coastal habitat, including areas used by nesting sea turtles. By minimizing storm-related damage and improving the stability of the beachfront environment, the project contributes to the long-term health and sustainability of coastal resources. In addition, the project enhances public access to and enjoyment of Mississippi's coastal resources through the construction of a continuous beachfront pathway. By combining coastal protection, habitat preservation, public access, and infrastructure resilience, the project provides lasting benefits that will help protect and enhance Mississippi's coastal environment for present and future generations.
- 16. Estimated Years To Completion
- 2
- 17. Estimated Completion Date
- 6/30/2029
- Budget:
- Salaries,Wages, Fringe
- $0
- Travel
- $0
- Architecture & Engineering
- $420,000
- Legal
- $0
- Consulting
- $0
- Construction
- $2,395,000
- Site Work
- $0
- Equipment
- $0
- Indirects
- $0
- Other
- $0
- Total
- $2,815,000
- Application Submission Date
- 07/31/2026
- Fiscal Year
- 2028
- Project Status
- Application Status
- Submitted
- Meets Criteria
- Internal Notes:
- Attachments:
- https://gomesa.dmr.ms.gov/attachments/GOMESA_1410_Attachment.pdf
- Hyperlink:
- Attachments