GOMESA Application Details


Internal Project Number
281433
1. Title of Project
West Biloxi Beach Boardwalk Phase I
2. Location of Project
Project is located along the south side of Hwy 90 in Biloxi, MS and extends from Debuys Road to the east entrance of Edgewater Mall.
3. Requesting Organization
City of Biloxi
4a. Name
Christy LeBatard
4b. Position
4c. Phone Number
228-435-6269
4d. Fax Number
4e. Address Line 1
487 Oaklawn Place
4e. Address Line 2
4e. City, State Zip
Biloxi, MS
4f. Email
clebatard@biloxi.ms.us
5. FundingRequested
$2,500,000
Awarded Amount:
6. Other State or Federal Funding Sources
No
7a. Amount of Additional Funds
7b. Source of Additional Funds
8. Total Project Funds Amount
$2,500,000
9. Project Description/Overview
The City proposes to construct approximately 3,900 feet of dual-purpose boardwalk/erosion barrier of concrete and composite decking along the south side of Hwy 90 from Debuys Road to the east entrance of Edgewater Mall. In areas of existing concrete boardwalk, the boardwalk will be expanded to add the erosion barrier and composite decking. In areas with no boardwalk, a new boardwalk will be constructed atop the existing seawall. Some amenities will include structural concrete, concrete flatwork, composite decking and timber beach access stairs.
10. Project Goals/Objectives
Project goals include: 1. Coastal conservation - reduce erosion of sand by creating a physical barrier 2. Public access - continue the City's "kneewall" boardwalk program to support access and enjoyment of the public beach 3. Public safety - reduce the driving hazards created by sand on U.S. Highway 90.
11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
(A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
Yes: This project will provide coastal conservation by reducing the erosion of wind blown sand by the addition of a concrete kneewall.
(B) Mitigation of damage to fish, wildlife, or natural resources.
(C) Implementation of a federally-approved marine, coastal, or conservation management plan.
(D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
12. Project Timetable/Milestones
After execution of a grant agreement, design and permitting will be complete within 1 year with construction completed within 1 year of design.
13. Project Timing
Short-term
14. Current status of architectural/engineering plans & specifications for this project (if applicable):
Other design has not been started Funds Not Budgeted
15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
The proposed dual-purpose boardwalk and erosion-control structure will help reduce the loss and migration of beach sand by creating a physical barrier that limits wind-driven erosion. In addition to providing safe and improved public access along the shoreline, the project will promote shoreline stabilization, protect valuable coastal resources, and help preserve the beach for long-term public recreational use.
16. Estimated Years To Completion
2
17. Estimated Completion Date
10/10/2028
Budget:
Salaries,Wages, Fringe
Travel
Architecture & Engineering
$250,000
Legal
Consulting
Construction
$2,250,000
Site Work
Equipment
Indirects
Other
Total
$2,500,000
Application Submission Date
10/01/2026
Fiscal Year
2028
Project Status
Application Status
Submitted
Meets Criteria
Internal Notes:
Attachments:
https://gomesa.dmr.ms.gov/attachments/GOMESA_1433_Attachment.pdf
Hyperlink:
Attachments
Back to List
An unhandled error has occurred. Reload 🗙