GOMESA Application Details


Internal Project Number
1195
1. Title of Project
Lift Station 43 Repairs
2. Location of Project
Felicity Street, Bay Saint Louis
3. Requesting Organization
City of Bay Saint Louis
4a. Name
Mike Favre
4b. Position
4c. Phone Number
228-466-5490
4d. Fax Number
4e. Address Line 1
688 Highway 90
4e. Address Line 2
4e. City, State Zip
Bay Saint Louis, MS 39520
4f. Email
mfavre@baystlouis-ms.gov
5. FundingRequested
$750,000
Awarded Amount:
$0
6. Other State or Federal Funding Sources
No
7a. Amount of Additional Funds
$0
7b. Source of Additional Funds
8. Total Project Funds Amount
$750,000
9. Project Description/Overview
This project includes the rehabilitation of lift station 43 which is a major lift station within the cities sewer collection system. This station serves Hollywood Casino and is near several tributaries which flow directly to the bay of Bay Saint Louis.
10. Project Goals/Objectives
- Increase quality of life for residents - Prevent overflow of wastewater to the surrounding natural drainage system, decreasing potential for groundwater contamination - Protect drinking water source - Provide significant improvements to hurricane/storm resistance for the utility infrastructure, which is an often-damaged area during storms - Reduction in repetitive losses to utility infrastructure
11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
(A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
Yes: The rehabilitation of lift station 43 protects groundwater from contamination.
(B) Mitigation of damage to fish, wildlife, or natural resources.
Yes: Protecting the groundwater mitigates the loss of fish, wildlife and natural resources.
(C) Implementation of a federally-approved marine, coastal, or conservation management plan.
(D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
12. Project Timetable/Milestones
Design and Planning- 3 months Construction- 6 months Closeout- 1 month
13. Project Timing
Short-term
14. Current status of architectural/engineering plans & specifications for this project (if applicable):
In Progress Funds Not Budgeted
15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
Rehabbing this lift station protects the ground water from contamination from lift station overflow. The location of this lift station is near several tributaries which serve as important habitats and carry various sediment, organic matter and volumes of water that contribute to unique conditions that support various specie.
16. Estimated Years To Completion
1
17. Estimated Completion Date
10/30/2024
Budget:
Salaries,Wages, Fringe
$0
Travel
$0
Architecture & Engineering
$100,000
Legal
$0
Consulting
$0
Construction
$650,000
Site Work
$0
Equipment
$0
Indirects
$0
Other
$0
Total
$750,000
Application Submission Date
07/10/2023
Fiscal Year
2025
Project Status
Not Awarded
Application Status
Accepted
Meets Criteria
Yes
Internal Notes:
Attachments:
Hyperlink: