GOMESA Application Details


Internal Project Number
271385
1. Title of Project
Utility Relocation (SEWER): MDOT Highway 90 Widening
2. Location of Project
Highway 90 (Bienville Blvd.) in Ocean Springs between MLK Blvd. / Vermont on the west and Highway 57 on the east.
3. Requesting Organization
City of Ocean Springs
4a. Name
Bobby Cox
4b. Position
4c. Phone Number
228-875-6722
4d. Fax Number
4e. Address Line 1
1018 Porter Avenue
4e. Address Line 2
4e. City, State Zip
Ocean Springs, MS
4f. Email
bcox@oceansprings-ms.gov
5. FundingRequested
$5,000,000
Awarded Amount:
6. Other State or Federal Funding Sources
No
7a. Amount of Additional Funds
7b. Source of Additional Funds
8. Total Project Funds Amount
$5,000,000
9. Project Description/Overview
This project will identify and correct conflicts between the planned MDOT project to expand Highway 90 / Bienville Blvd. The MDOT project impacts approximately 83% of the length of this roadway within the city limits of Ocean Springs. It has been explained to city staff that existing utilities must be modified to eliminate conflicts per the plans provided, allowing the project to move forward. Both water and sewer will need to be corrected before the project can be advertised – this request will handle the sewer modifications to address any infiltration or contamination issues that impact groundwater.
10. Project Goals/Objectives
1. This project will evaluate the conflicts as identified to provide the appropriate modification. 2. Adjustments to accommodate the conflicts will be designed to ensure that the system integrity is maintained or improved to prevent groundwater contamination. 3. Maintaining a stable and effective sewer system, especially during a major construction project, will protect the integrity of the groundwater and adjacent environmental systems. 4. Providing the necessary utility improvements will allow a vital MDOT transportation project to move forward.
11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
(A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
(B) Mitigation of damage to fish, wildlife, or natural resources.
Yes: Ensuring that the underground sewer system impacted by the pending transportation improvement project maintains or improves integrity will protect the flora and fauna that depend on the natural environment.
(C) Implementation of a federally-approved marine, coastal, or conservation management plan.
(D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
12. Project Timetable/Milestones
* Authorize consultant to move forward with design on identified sewer system conflicts. * Develop specifications and construction schedule to coordinate with all impacted services. * Submit permit applications for all utility modifications as required. * Advertise for construction and award contract accordingly.
13. Project Timing
Short-term
14. Current status of architectural/engineering plans & specifications for this project (if applicable):
In Progress Funds Not Budgeted
15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
As the City of Ocean Springs grows, utility improvements are essential to ensure continued environmental quality of the groundwater and the health and resiliency of the surrounding ecosystems. This project would allow the city to benefit from the planned MDOT transportation improvements while maintaining underground sewer infrastructure to protect the environment.
16. Estimated Years To Completion
3
17. Estimated Completion Date
12/31/2029
Budget:
Salaries,Wages, Fringe
Travel
Architecture & Engineering
$275,000
Legal
Consulting
Construction
$4,500,000
Site Work
Equipment
Indirects
Other
$225,000
Total
$5,000,000
Application Submission Date
01/29/2026
Fiscal Year
2027
Project Status
Application Status
Submitted
Meets Criteria
Internal Notes:
Attachments:
Hyperlink:
Attachments
Back to List