GOMESA Application Details


1. Title of Project
City of Pass Christian Gravity Sewer Improvements
2. Location of Project
Henderson Avenue between CSX Railroad and West North Street, Pass Christian, MS
3. Requesting Organization
City of Pass Christian
4a. Name
R. James Rafferty
4b. Position
4c. Phone Number
228-452-3310
4d. Fax Number
4e. Address Line 1
200 West Scenic Drive
4e. Address Line 2
4e. City, State Zip
Pass Christian, MS
4f. Email
jrafferty@pass-christian.com
5. FundingRequested
$2,854,683
Awarded Amount:
$0
6. Other State or Federal Funding Sources
No
7a. Amount of Additional Funds
$0
7b. Source of Additional Funds
8. Total Project Funds Amount
$2,854,683
9. Project Description/Overview
This project will serve to replace a portion of the existing gravity sewer system on Henderson Avenue, within the city limits of Pass Christian. The project boundaries extend along Henderson Avenue from CSX Railroad to West North Street. The existing system was constructed during the 1950's and 1960's and is still comprised of vitrified clay pipe with intermittent locations of PVC due to repairs that have been required through the years. With the increase in activity in these areas, due to continued efforts to rebuild post-Hurricane Katrina, upgrades to existing fiber optic infrastructure, gas service and industrial activity due to an upswing in the economy, the city has been experiencing frequent failures in the aging sewer collection system. While the known failures in the pipes are being addressed as the problems surface, there are many more locations with similar problems that are also in need of repair. These types of problems range from circumferential cracks in the pipe, root penetrations, cracks at the pipe bells, etc. These failures are believed to be a result largely due to the increases in the vehicular loadings causing excessive vibrations over the years, poor soil conditions, and the toll taken by numerous storm events since the infrastructure was installed. In addition to the ongoing problems with the pipes, the accompanying manholes area experiencing considerable degradation due to the sewer gases present in the system. These gases have caused immeasurable damage to the old brick manholes in the failure of the brick mortar.
10. Project Goals/Objectives
To provide a safe and reliable source of sewer collection in one of the more heavily trafficked areas of the City, in an effort to eliminate the potential for sewer overflows and contamination of adjacent surface waters.
11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
(A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
Yes: This project will serve to continue to protect coastal areas by repairing failing sewer collection systems, thereby eliminating sources of contamination to coastal areas.
(B) Mitigation of damage to fish, wildlife, or natural resources.
(C) Implementation of a federally-approved marine, coastal, or conservation management plan.
(D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
12. Project Timetable/Milestones
0-6 months - Design 6-9 months - Advertise and award the project 9 months -18 months - Construction of the project
13. Project Timing
Short-term
14. Current status of architectural/engineering plans & specifications for this project (if applicable):
Other Planning Phase Funds Not Budgeted
15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
By eliminating potential sources of contamination to adjacent surface waters and coastal environments, this will aid in protecting marine resources and the public health from contaminants.
16. Estimated Years To Completion
2
17. Estimated Completion Date
11/1/2025
Budget:
Salaries,Wages, Fringe
$0
Travel
$0
Architecture & Engineering
$349,916
Legal
$0
Consulting
$0
Construction
$2,504,766
Site Work
$0
Equipment
$0
Indirects
$0
Other
$0
Total
$2,854,682
Internal Project Number
1279
Application Submission Date
06/18/2024
Fiscal Year
2026
Project Status
Application Status
Submitted
Meets Criteria
Internal Notes:
Back to List
An unhandled error has occurred. Reload 🗙