GOMESA Application Details


Internal Project Number
1179
1. Title of Project
Waveland - lnfill Area Infrastructure Improvements - Phase 2
2. Location of Project
The project is located on the south ·ide of Phase I. It includes Chris Street and Carroll Street and is bounded on the east by Combe! Street and extends just west of Sycamore Street.
3. Requesting Organization
City of Waveland
4a. Name
Jay Trapani
4b. Position
4c. Phone Number
228-467-4134
4d. Fax Number
4e. Address Line 1
301 Coleman Avenue
4e. Address Line 2
4e. City, State Zip
Waveland, MS 39576
4f. Email
jay@waveland-ms.gov
5. FundingRequested
$3,300,000
Awarded Amount:
$0
6. Other State or Federal Funding Sources
No
7a. Amount of Additional Funds
$0
7b. Source of Additional Funds
8. Total Project Funds Amount
$3,300,000
9. Project Description/Overview
This project will serve to extend City water and sewer infrastructure to a part of the City that is mostly unserved. The project boundaries start on the south side of Phase I and include Chris Street and Carroll Street. The east project boundary is Combe! Street and the west boundary is just west of Sycamore Street. The existing sewer system only serve a small portion of the project area and still consists of vitrified clay pipe with intermittent section. of PVC pipe where repaired. The City is growing and need to provide water and ewer service to unserved areas of the City. The lack of sewer and water infrastructure. as well as sections that arc well past their design life. increases the risk of contamination to the surrounding water bodies as well as the risk of contaminating private drinking water wells. In addition, residents not ser ed by a public water system are al increased fire danger.
10. Project Goals/Objectives
- Extend public water and sewer mains to unserved area - Replace dilapidated existing infrastructure. - Increase resiliency for City infrastructure. - Extend fire protection. - Reduce infiltration and inflow and corresponding sanitary sewer overflows.
11. Which of the following authorized uses set forth in the GOMESA Act does this project fall under?
(A) Projects and activities for the purpose of coastal protection, including conservation, coastal restoration, hurricane protection, and infrastructure directly affected by coastal wetlands losses
Yes: Improvements and extensions to public infrastructure will decrease sanitary sewer overflows spilling into adjacent coastal wetland as well as removing failing septic systems, thus improving adjacent water quality. Installing and extending new potable water mains will increase resiliency in the face of sto1ms and provide basic systems that are easier to restore to service after hurricanes.
(B) Mitigation of damage to fish, wildlife, or natural resources.
(C) Implementation of a federally-approved marine, coastal, or conservation management plan.
(D) Mitigation of the impact of Outer Continental Shelf activities through funding of onshore infrastructure projects.
Yes: Construction of this project will harden and provide resiliency to the City's infrastructure during storms.
12. Project Timetable/Milestones
It is estimated that this project will be fully constructed within two (2) years from the date of funding. This allows for one (1) year for surveys, design, permitting and bidding, followed by one (1) year of construction.
13. Project Timing
Short-term
14. Current status of architectural/engineering plans & specifications for this project (if applicable):
In Progress Funds Not Budgeted
15. In what way does this project meet the goals and objectives of the Department of Marine Resources, which includes enhancing, protecting and conserving the marine interest of Mississippi for present and future generations?
This project will extend public infrastructure and replace existing, failing, infrastructure which will decrease overflows, failing septic, contamination of private wells, contamination of shallow groundwater. This will reduce bacterial and biological contamination to adjacent waterbodies like Jackson Marsh and the Mississippi Sound. This in turn will help protect local fish and shellfish populations.
16. Estimated Years To Completion
2
17. Estimated Completion Date
7/1/2025
Budget:
Salaries,Wages, Fringe
$0
Travel
$0
Architecture & Engineering
$505,000
Legal
$0
Consulting
$0
Construction
$2,795,000
Site Work
$0
Equipment
$0
Indirects
$0
Other
$0
Total
$3,300,000
Application Submission Date
06/23/2023
Fiscal Year
2025
Project Status
Not Awarded
Application Status
Accepted
Meets Criteria
Yes
Internal Notes:
Attachments:
Hyperlink: